Tahincioğlu Real Estate is a Tahincioğlu Holding group company, operating in the real estate development and investment areas. Tahincioğlu Real Estate, one of Turkey’s leading trademarks in the real estate industry, undertakes premium retail, office, residence and shopping mall projects as well as the construction and development of luxury hotels with an experience of over 65 years.
In addition to these projects, the company also actively manages its extensive portfolio comprised of revenue-generating real estate assets. The total construction area of projects completed by Tahincioğlu covers over 4 million square meters to date.
As of 2020, Tahincioğlu has established two new companies, namely Tahincioğlu Management and Services and Nidapark Real Estate, expanding its services in the real estate sector while maintaining its ongoing activities.
Tahincioğlu’s construction company Nida Construction is the general contractor for all Tahincioğlu projects. Among the projects that have become synonymous with the company are Palladium Tower, Palladium Ataşehir Shopping Mall and Residence, Palladium Antakya Shopping Mall, Nidakule Kozyatağı, Nidakule Göztepe and Swissôtel Grand Efes and Convention Center.
Sentido Perissia Hotel and Perissia Hotel Cappadocia are also among the hotel projects developed, constructed and later handed over by Tahincioğlu. The office projects Nidakule Kozyatağı, Nidakule Ataşehir West, Nidakule Ataşehir Sout, Nidakule Ataşehir North, Nidakule Göztepe and Nidakule Levent have been completed, while residential projects Nidapark Küçükyalı, Nidapark İstinye and Nidapark Ayyıldız are still under construction. Having completed and delivered Nidapark Beşiktaş in June 2015, Nidakule Seyrantepe in June 2017, Nidapark Başakşehir in October 2017, Nidapark Kayaşehir in August 2019 and found within the Nidapark Küçükyalı Project the Nidapark Küçükyalı Kınalı Phase in August 2020, Nidapark Küçükyalı Sedef Phase in April 2021. Tahincioğlu has put the Nidapark Çengelköy project up for sale at the end of Q1 of 2021.
| LOCATION | |
| ARCHITECTURE | |
| DATE OF DELIVERY | JULY 2014 |
| CONSTRUCTION SITE | 100.000 m² |
| RENTAL AREA | 55.000 m² |
| DELIVERY | 43 OFFICE FLOORS |
| GROSS FLOOR AREA | 930 - 1096 m² |
| GROSS FLOOR HEIGHT | 3,90 m |
| HEATING | |
| NO. OF LIFTS | 8 PASSENGERS + 1 LOAD + 3 CAR PARKS |
| NO. OF CLOSED CAR PARKS | 1012 |
| NO. OF CAR PARKS PER FLOOR | 15 -18 |
| ENVIRONMENTAL AWARENESS | GOLD LEED CERTIFICATE |
| CONSTRUCTION | The tools using in implementation will be proper to Turkish Manufacturing Standarts, Prosperity Specifications, and national norms. |
| FRONT SPIECE | Cutain Wall Sytem will be used for exterior.There are high heat and sound insulation features in exterior.The wind simulation test was made according to exterior design. |
| WALL | There are gas concrete and gypsum board that lead to sound isolation between independent walls.Wet in 1st class ceramic tiles will be made available in public areas. There are gas concrete and gypsum board that don’t reach to ceiling in store walls. There are gas concrete and gypsum board in communal areas. |
| WALL COATINGS | The floor of independent areas will be reinforced concrete that suitable for false floor. The false floor will completed by owner or tenant. There will be fieldstone covering in communal areas and floors. Fieldstone, ceramic, carpet, wood etc. will be used social parts of communal areas. All of the services and fire escape corridors will be paint covered concrete. |
| WALL COATINGS | Independent chapter walls will be delivered as made of aerated concrete or plaster over drywall. In all elevator halls will be used natural stone cladding. Common architecture in the social area materials will be used in the project in accordance with the wood, natural stone, wall paper, plaster painting, etc... All service and fire escape corridorpaint will be applied by concrete. |
| DOORS | Independent section gates’ doors will be temporarily completed as aluminum. Then, the doors which are suitable for the interior decoration will be made by the owner or tenant. Fire-resistantance certified steel doors with panic push bar will be installed in areas where fire regulations require. Tower revolving glass door entrance to the project and appropriate standards will be found. Steel or aluminum casing wood veneer doors that suitable for architectural projects will be made in the public areas. Wet doors will be compact laminate door. Warehouse doors will be steel framed with steel or aluminum doors. |
| CEILS | The ceilings in independent areas will be concrete. Plasterboard suspended ceiling will be produced in communal areas. All wet areas of commonunal areas plasterboard suspended ceiling or ceiling material based on design parameters. Parking ceilings, concrete fire escape and service corridors will be delivered as concrete ceilings painted with plastic paint. |
| WET AREAS | First quality water-saving fixtures that are appropriate to Leed Criteria will be used. Production of compact laminate partitions will be carried out in wet areas. 1st class ceramic tiles will be made on the floor according to the Project. |
| ELECTRICAL ENERGY DISTRIBUTION | To meet the energy structure medium voltage switchgears and substation facilities that are found will be in the transformer. Due to high structure; power distribution Busbar system will be established for floors.The project with local regulations on electrical installations will be designed in accordance with European and International Standards. |
| BACKUP POWER SYSTEM | When the utility power fails, all the needs of structure will meet 100 % diesel generator, Security systems, computers, office management , computer and telephone systems , alarm systems , fire alarm and fire dampers feeding the UPS infrastructure will be created in structure. |
| LIGHTING SYSTEM | The common areas will be provided with 1 class lighting fixtures. Emergency lighting and emergency exit guidance lighting in public spaces and car parks will be provided with a sufficient amount of emergency luminaires. |
| ELEVATORS | According to the number of floors of the office building serving the project and technical features staff elevators one service and firefighter elevators ; parking facility elevator will be in accordance with the number and specifications of the project. EMS can be monitored from the control room lift (elevator menagement System) will be established. Security cameras and emergency evacuation system will be established in the cabin. |
| HEATING - COOLING SYSTEM | Heating with natural gas-fired boilers for offices and common areas, the cooling system with water-cooled chillers will be made in the central system. Using 4-pipe fan coil units for heating and cooling systems in public areas will be realized. For heating and cooling installations of Office will be left ready and suitable for installation 4-pipe fan-coil systems infrastructure. Heating and cooling costs for each individual department will be measured by calorimetry. Shops - grocery - cafe areas for VRF infrastructure will be prepared. |
| VENTILATION SYSTEM | The infrastructure of the office floors will be prepared fresh air and exhaust systems for each individual office, the heat recovery unit type will be made by the central ventilation air handling units. 10 m² / person admission and 50 m³ / h fresh air will be provided. Office floors will be made central air conditioning in wet areas. In the parking floors normal ventilation and smoke exhaust system will be implemented as fan'l jet system. Smoke evacuation system on all floors, fire escapes and emergency elevator pressurization will be applied. |
| FIRE EQUIPMENT | Automatic sprinkler system throughout the building (sprinklers) will apply. Fire cabinets will be placed in common areas, fire hydrants will be placed around the building. Interoffice pendent ( drooping type) sprinkler system will be done by Landlord / Tenant |
| PLUMBING | Ladies and gentlemen of the office floors will be wet common locality. All the materials used will be in accordance with TSA and other national regulations. Central water reservoir and pump systems will be implemented. Hot water needs will be met with the local electric water heaters. |
Barbaros Mahallesi Mor Sümbül Sokak No:7/3 34746 Ataşehir/İSTANBUL
Barbaros Mahallesi Mor Sümbül Sokak No:7/3 34746 Ataşehir/İSTANBUL

İnönü Cad. Devres Han No:50 2/A
Gümüşsuyu 34437 Istanbul, Türkiye
T: (+90) 212 334 78 00
F: (+90) 212 334 78 29
[email protected]
Elif EzgeçKıdemli Danışman M: (+90) 533 443 58 95 |
Savaş GürbüzKıdemli Danışman M: (+90) 532 738 66 64 |
Semi SilikiDanışman M: (+90) 537 854 26 37 |
For The Constructions Shaping The Future.
CZD Gayrimenkul has been founded on February 5th 2014 to expand horizons of both in production and in investment of construction industry and pioneer new trends.
Our aims are to devise projects for urban transformation process, to improve new terrains in new regions, to devise domestic and international concept projects, to create short and medium term investment areas and to introduce a new perspective to the industry.
CZD Gayrimenkul is creating real estate portfolio of regions with high investment value in Turkey especially in Istanbul, expanding to new terrains and designing new concept projects for assets on the portfolio.